Press

A company that makes everyone happy tomorrow

  • 5. Die Try-Out Press

    Explanation
    Resolve the problem by connecting the newly made mold or the mold that needs repair to the press and confirm the molding.
    The structure operates in a hydraulic/mechanical manner.
    Main Task
    Design and Installation of the Field for New Equipment
    The Design and Installation of the Field for the Improvement of the old Equipment
    PLC panel design and production
    Programming and Commissioning (ROCKWELL, MELSEC, SIEMENSE, XG5000 etc.)
    HMI Design(Touch system)