Press
A company that makes everyone happy tomorrow
-
5. Die Try-Out Press
- Explanation
- Resolve the problem by connecting the newly made mold or the mold that needs repair to the press and confirm the molding.
- The structure operates in a hydraulic/mechanical manner.
- Main Task
- Design and Installation of the Field for New Equipment
- The Design and Installation of the Field for the Improvement of the old Equipment
- PLC panel design and production
- Programming and Commissioning (ROCKWELL, MELSEC, SIEMENSE, XG5000 etc.)
- HMI Design(Touch system)