2025 GMK BP B50 line main motor moving installation
페이지 정보
작성자 최고관리자 댓글 0건 조회 778회 작성일 21-10-13 13:15본문
In August 2025, a Motor junction box was installed at the GM Korea Bupyeong plant to add a main motor gearbox.
Machine Specification
Description | PR1 | ||||||
Maximum capacity | Total | ton | |||||
| Upper stream capacity | ton | ||||||
| Lower stream capacity | ton | ||||||
Slide stroke | mm | ||||||
Slide adjustment | mm | ||||||
Die height | mm | ||||||
Number of Slide Strokes | SPM | ||||||
Bolster dimensions | Upper stream bolster | mm | |||||
Lower stream bolster | mm | ||||||
Slide dimensions | Upper stream slide | mm | |||||
Lower stream slide | mm | ||||||
Balance cylinder capacity | Upper stream balancer | metric ton | |||||
Lower stream balancer | metric ton | ||||||
Main moter output | kw | ||||||
Working energy (at 10~ 16spm) | t-n | ||||||
Bolster height | mm | ||||||
Transfer feeder | Feed height | mm | |||||
Feed stroke | mm | ||||||
Clamp stroke | mm | ||||||
Lift stroke | mm | ||||||
Transfer bar closed inside distance | mm | ||||||
Capacity of die cushion | Die cushion | metric ton | |||||
Stroke | mm | ||||||
Pad dimensions | mm | ||||||
Construction
- New installation of Main motor junction box
- 이전글GMK BP B50 Line Auto Rack System(ARS) 21.10.13
- 다음글GMK BP B10 Line Drive Refurbishment 21.10.13
댓글목록
등록된 댓글이 없습니다.
