Performance

Introduce the business performance of Woori Technology.

2024 ​GMK BP B35 line MDV replacement

페이지 정보

작성자 최고관리자 댓글 0건 조회 549회 작성일 21-10-13 13:15

본문

MDV panel and main motor replacement construction for B35 at GMK Bupyeong plant in August 2024.


Machine Specification

 Description

 PR1

 Maximum capacity

 Total

 3500 ton

 Upper stream capacity 2300 ton 
 Lower stream capacity 1200 ton

 Slide stroke

 1000 mm

 Slide adjustment

 210 mm

 Die height

 1250 mm

 Number of Slide Strokes

 5 & 8 ~18 SPM

 Bolster dimensions

 Upper stream bolster 

 4000 x 3600 x 300 mm

 Lower stream bolster 

 6100 x 3600 x 300 mm

 Slide dimensions

 Upper stream slide 

 4200 x 3600 mm

 Lower stream slide

 6300 x 3600 mm 

 Balance cylinder capacity

 Upper stream balancer

 24 metric ton

 Lower stream balancer

 36 metric ton 

 Main moter output

 DC 315 kw

 Working energy (at 10~ 16spm)

 90 t-n

 Bolster height

 810 mm

 Transfer feeder

 Feed height

 700 mm

 Feed stroke

 2100 mm

 Clamp stroke

 500 mm

 Lift stroke

 250 mm

 Transfer bar closed inside distance

 1800, 1900, 2100, 2400,

 2700, 3000, 3300, 3600 mm 

  Capacity of die cushion

 Die cushion

 200 metric ton

 Stroke

 300 mm

 Pad dimensions

 1700 x 3200 mm 


Construction

 - Replacement to siemens main motor

 - Siemens drive panel installation


Commissioning

 - Rockwell ControlGuardLogix PLC

 - Siemens Tia-Portal HMI


Communication

 - Ethernet/IP

댓글목록

등록된 댓글이 없습니다.