2024 GMK BP B50 line MDV replacement
페이지 정보
작성자 최고관리자 댓글 0건 조회 547회 작성일 21-10-13 13:15본문
MDV panel and main motor replacement construction for B50 at GMK Bupyeong plant in August 2024.
Machine Specification
Description | PR1 | ||||||
Maximum capacity | Total | ton | |||||
Upper stream capacity | ton | ||||||
Lower stream capacity | ton | ||||||
Slide stroke | mm | ||||||
Slide adjustment | mm | ||||||
Die height | mm | ||||||
Number of Slide Strokes | SPM | ||||||
Bolster dimensions | Upper stream bolster | mm | |||||
Lower stream bolster | mm | ||||||
Slide dimensions | Upper stream slide | mm | |||||
Lower stream slide | mm | ||||||
Balance cylinder capacity | Upper stream balancer | metric ton | |||||
Lower stream balancer | metric ton | ||||||
Main moter output | kw | ||||||
Working energy (at 10~ 16spm) | t-n | ||||||
Bolster height | mm | ||||||
Transfer feeder | Feed height | mm | |||||
Feed stroke | mm | ||||||
Clamp stroke | mm | ||||||
Lift stroke | mm | ||||||
Transfer bar closed inside distance | mm | ||||||
Capacity of die cushion | Die cushion | metric ton | |||||
Stroke | mm | ||||||
Pad dimensions | mm |
Construction
- Replacement to siemens main motor
- Siemens drive panel installation
Commissioning
- Rockwell ControlGuardLogix PLC
- Siemens Tia-Portal HMI
Communication
- Ethernet/IP
- 이전글GMK BP B35 line MDV replacement 21.10.13
- 다음글Hyundai Mobis North American motor, reducer, PE 2nd production line 21.10.12
댓글목록
등록된 댓글이 없습니다.